Thumbnail | Description and Available Versions |
| Initial Examination |
 |
Jordanian officers in Jafr Desert with the desert penetrometer
© SSC Programme Ltd
|
 |
Off-road vehicle in Jafr Desert
© SSC Programme Ltd
|
 |
Richard Noble mapping out Jafr Desert
© SSC Programme Ltd
|
 |
Richard Noble marking out the track in Jafr Desert
© SSC Programme Ltd
|
 |
Richard Noble with Global Positioning System receiver mapping out Jafr Desert
© SSC Programme Ltd
|
 |
A camel roaming Jafr Desert
© SSC Programme Ltd
|
| Track Survey |
 |
Track survey team -the Official Photo!
© SSC Programme Ltd
|
 |
Desert Survey Team
© SSC Programme Ltd
|
 |
The Desert Penetrometer - used to measure the load-bearing capability of the desert
© SSC Programme Ltd
|
 |
Surveying the desert
© SSC Programme Ltd
|
| Track Preparation |
 |
Filling and grading a crossing road at km 0.7
© SSC Programme Ltd
|
 |
Scraping off the crusted bits
© SSC Programme Ltd
|
 |
Road crew
© SSC Programme Ltd
|
 |
5.5 mile point markings
© SSC Programme Ltd
|
 |
An early attempt at dragging a line
© SSC Programme Ltd
|
 |
First attempt at marking track with teeth on a drag
© SSC Programme Ltd
|
 |
Dawn over Jafr Desert
© SSC Programme Ltd
|
 |
Interior of the hangar to be used by Thrust SSC
© SSC Programme Ltd
|
 |
Desert work site
© SSC Programme Ltd
|
 |
Desert work vehicles
© SSC Programme Ltd
|